2.5 Million Gallon Per Day Triple Peak SWTP

Triple Peak SWTP: 2.5 Million Gallon Per Day Treatment Plant

Surface water for the Triple Peak system is produced at our 2.5 million gallon per day Triple Peak Surface Water Treatment Plant. As the raw water from Canyon Lake travels to the filters, coagulants are injected to encourage small particles to cling to one another and sink to the bottom of the clarifiers. Once the water enters the top of filter chamber, it percolates through the anthracite and gravel filter-media. As the water leaves the filters, it is injected with chlorine for final disinfection and storage, prior to being pumped to the distribution system.